BROOKLYN BRIDGE CONTRACT 6 WILL REQUIRE NUMEROUS OVERNIGHT AND WEEKEND CLOSURES OF INBOUND VEHICULAR TRAFFIC. RESTORE PAVEMENT AFTER SUFFICIENT TIME FOR CURING. 1A. Permittees are responsible for maintaining the restoration for the duration of the "Guarantee Period" and must retain insurance for this purpose. (212) 839-2387/88/89 FULL TRAVEL LANE RESTORATION WOULD BE REQUIRED FOR 11' WIDTH OF TRAVEL LANE AND THE LENGTH OF THE WORK PLUS ANY LL14 CUTBACKS. All materials used for backfill must be free from bricks, blocks, excavated pavement materials and/or organic material or other debris. NYC DOT's concrete repair schedule for roadways, sidewalks and other assets in the street can also be accessed from this link. All other times - (718) 433-3340, From 7:00 AM to 3:30 PM, Monday to Friday: (212) 839-9697/99 or 9688 SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. 80-30 Park Lane Include the names of any expediter. A list of partially and fully restricted streets where canopy placement is limited or prohibited can be found in the Highway Rules, Section 2-04(f). Real-Time Traffic Conditions & Cameras. Applications for renewal of a canopy maintenance permit must be made at least one month prior to the permit expiration date and must be submitted to the Permit Office in the borough in which the canopy is located. IF LOCATION IS IN SCHOOL ZONE AS SPECIFIED IN SCHOOL STIPULATION, MAY ONLY WORK 9 AM TO 2 PM MON TO FRI WHEN SCHOOL IS IN SESSION (083 STIPULATION). The applicant will also be notified of any corrective action necessary and recourses available. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE NORTHEAST QUADRANT OF THE INTERSECTION. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. Similarly, the sooner a potential street excavator knows about NYC DOT's intent to work in a particular location, the better it can make arrangements to avoid or reduce potential conflicts. Call before you dig. (212) 839-8856, The Bronx WORK 7 PM - 6 AM WEEKNIGHTS, NO WEEKENDS. Adjoining Existing and New SidewalksJunctions and transitions between new and existing sidewalks must conform to specifications. WORK 7 PM-10 AM WEEKNIGHTS. They shall not be in a stand alone subset. A statement that the canopy design and construction conforms to NYC DOT Standard Details of Construction. STANDARD SHEETS (METRIC) > Doing Business with NYSDOT - (business-center) > Engineering > CADD Info > Drawings > Standard Sheets (Metric) > 619 Maintenance and Protection of Traffic Note: Effective May 2017 no new or updated versions of Metric Standard sheets will be published. A separate permit is required for each construction-related activity, except where otherwise provided in the Highway Rules or by permit stipulations. A permit is not required to install, repave, reconstruct or repair any sidewalk where the work involves an area of less than 25 square feet, unless the purpose of the work is to remove a violation. In order to maintain world-class streets, permits must be obtained for the work performed in the street. Brooklyn PERMITTEE MUST EMAIL DEP AT. ). Section 2.3 Key Principles for Effective Notice and Coordination of Planned Street Work, Section 3.3 The Permit Application Process, Section 3.6 Emergency Work and Special Circumstances, http://www.nyc.gov/html/dot/downloads/pdf/insurancereq.pdf, Instructions for Permittee Registration Application, Application for Roadway/Sidewalk Permit(s), Appendix A, Common Permit Types and Documents Needed, Appendix D, Other Agency and Utility Contact Information, Application for Governmental Work Permit(s), Section 3.5 Other Provisions Pertaining to Permits, Application to Renew Governmental Permit(s), The permit application is available online, Chapter 4, Section 4.5 Street Construction Inspections and Enforcement, Request for Roadway/Sidewalk Permits during Embargo Periods form, Section 4.3 Street Restoration Requirements, Building Operations/Construction Activity Permits, Minimum Clearance Requirements For Transformer Vaults, Department of Design and Construction, Construction Director Borough Offices, Department of City Planning Borough Offices, Department of Parks and Recreation Borough Offices, Environmental Control Board Borough Offices, Chapter 2Advance Notice and Coordination of Planned Street Work, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Street Arterial Maintenance (SAM) Release Form for Protected Streets, Application to Renew Governmental Work Permit(s), Application to Reissue Governmental Work Permit(s), Written Consent from Property Owner to install and maintain a canopy, Temporary Construction Signage Purchase Directions, Construction Project Information Signs (CPIS) Directions, Engineering Package for Vault Application, Section 3.4 Canopy Authorization and Permits, Weekly milling, resurfacing and concrete repair schedules, Insurance and Indemnification Requirements from Title 34, Rules of the City of New York, Critical Streets list in the Highway Rules, Section 2-07 (c) (5), Franchise, Concession or Revocable Consent, Application to Re-issue Government Permits, Additional information about historic districts, Construction Embargos at the Special Traffic Advisory link, Request for Roadway/Sidewalk Permits during Embargo Periods, Information regarding sidewalk violations, Pave Street-W/ Engineering & Inspection Fee, Place Equipment Other Than Crane Or Shovel, Franchise Installations (Overhead Structures), Electric power lines, cables, conduit and lighting cables, Gas, oil, steam, petroleum and gaseous materials, Communications, alarm, signal lines, cables and conduit, Reclaimed water, irrigation and slurry lines, REQUIRES DOB APPROVAL or REQUIRES DOT FRANCHISE, CONDUIT CONSTRUCTION (CABLE, TELECOMMUNICATION) AND FRANCHISE, REQUIRES DOT HIGHWAY INSPECTION QUALITY ASSURANCE (HIQA) APPROVAL, REQUIRES APPROVAL FROM DOT SIGNALS UNIT or, REQUIRES DOB APPROVAL (IF IN CONJUNCTION WITH A NEW BUILDING OR BUILDING ALTERATION), FRANCHISE INSTALLATION (OVERHEAD STRUCTURE), REQUIRES APPROVAL FROM DOT STREET LIGHTING UNIT, Franchises, Concessions and Consents - (212) 839-6550, MTA/NYCT - Bus Operations - (646) 252-5517 or (646) 252-5544, 18 inches (maximum 24 inches) from the grating edge perpendicular to curb, Division of Review & Construction Compliance - (718) 595-5223 or Plan Review Section - (718) 595-5191, * Maintain minimum Clear Path requirement (Below), General customer service - (800) ASK-USPS, 5 feet offset along the curb line (Not Permitted in front), Department of Consumer Affairs - 311 or (212) NEW-YORK outside the five boroughs, Con Ed, Verizon, National Grid, etc. THIS STIP VOIDS ANY/ALL OTHER CONFLICTING STIPS ON THIS PERMIT UNLESS ACCOMPANIED WITH VARIANCE STIP VAR001. Manhole Embargo, Commercial Refuse Container, Temporary Plates and Shunts, Steam Tanks and Nitrogen Tanks permits are processed and stipulated directly by NYCSTREET. REQUIRES LOWER MANHATTAN BOROUGH COMMISSIONER'S OFFICE (LMBCO) REVIEW. New York, NY 10004 (718) 391-1937 Specific requirements for filling in abandoned vaults can be found in Section 2-13(o) of the Highway Rules. CGL insurance. RESTORATION OF ROADWAY WHICH HAS RED COLORED BUS LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF TERACOTTA #103856 RIDE-A-WAY COATING MATER'L MFG'D BY INTERGRATED PAVING CONCEPTS INC OR EQUIVALENT. These forms may also be found inAppendix B, Forms. CONTRACTOR MAY NOT REMOVE OR RELOCATE ANY PARKING METERS OR BLOCK PUBLIC ACCESS TO MUNI-METERS WITHOUT FIRST OBTAINING APPROVAL FROM NYCDOT PARKING METER DIVISION AT 718-894-8651. Failure to comply with an order issued by the Commissioner may result in criminal or civil penalties. Standard Sheets (US Customary) - New York State Department of New York City Department of Transportation Atransformer vaultis a subsurface structure or room that houses electrical transformers and appurtenant equipment. These include: Certain circumstances are considered to be emergencies, meaning situations that endanger the public safety or cause or are likely to cause the imminent interruption of service. Office hours: 8:30 AM-4:30 PM, Brooklyn THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR SPECIFIC TRAVEL LANE RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. CONTRACTORS SHALL NOTIFY POLICE, FIRE, EMS, COMMUNITY BOARDS, AND ABUTTING PROPERTY OWNERS 48 HOURS PRIOR TO CONSTRUCTION. In calendar year 2018 NYC DOT processed more than 700,000 construction permits. DESIGNATED AS COBBLESTONE STREET. Special and separate procedures govern emergency work: one for utility access covers (including those for "manholes," valve covers and grates) and one for street openings/excavations. WORK 8 AM TO 7 PM MONDAY TO FRIDAY. Private property owners are responsible for installing, repairing and maintaining sidewalks abutting their properties. (IV) FIVE FEET OF RAIL ROAD TRACKS. Applicants must submit a completed permit application. Please note that although permits can be submitted, paid for and printed out 24/7, the permit review process occurs only during normal weekday Permit Office hours. EmbargoesNYC DOT imposes construction "embargoes" (a temporary suspension of active permits in the affected area) for significant special events including the New York City Marathon, parades, high profile projects and the winter holiday season. A statement of the basic construction details including type, description and color of the canopy covering; type, diameter and gauge of all supporting members; description of the frame, wind bracing assembly and sidewalk and building fastenings; description of proposed lettering on the canopy covering including exact wording and dimensions thereof; three 5 inch by 7 inch photographs of the proposed site. ONE 11-FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY, ON WEEKENDS, DEFINED AS 12:01AM SATURDAY THROUGH 6AM MONDAY. Any foundation material not meeting specifications must be removed. With over 185,000 corners, the Pedestrian Ramp Program is a robust program focused on installing and upgrading pedestrian ramps (curb ramps) throughout the five boroughs. The New York City Department of Transportation (NYC DOT) has adopted specifications and regulations stipulating how street work must be performed in order to minimize disruption and maintain the integrity of the street surface. ONLY FOR CORRECTIVE ACTION FOR SPECIAL EVENTS. New York, NY 10007 Executive (EXC) hold An EXC hold is automatically placed if the proposed permit locations involve locations deemed necessary by NYC DOT. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Jamaica, NY 11435 MAY ALSO CLOSE SIDEWALK ON NORTH SIDE FRONTING DEVELOPMENT. Download a PDF of theGlossary and Appendicesfor offline access to the Resources section. Click here to download. 144-06 94th Avenue, Main Floor Some of the requirements include, but are not limited to the following, where the applicant must: New York 811 is a nonprofit organization that acts as a communications link between utility companies and individuals planning any digging activity in the five boroughs of New York City and Nassau and Suffolk Counties on Long Island. THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. Sidewalk Construction Permits are designated as the "04" permit series, meaning all permits in this category begin with "04". These are in addition to the "Common Requirements" listed at the beginning of this section. CONTRACTOR/PERMITTEE IS REQUIRED TO POST AND MAINTAIN ADVISORY SIGNS A MINIMUM OF48 HRS PRIOR TO CHANGING EXISTING PARKING REGULATION SIGNS TO APPROVED TEMPORARY CONSTRUCTION PARKING REGULATION SIGNS. (See Chapter 4, Section 4.5 Street Construction Inspections and Enforcement regarding the circumstances in which CARs may be issued.). Home | Pedestrian Ramp Program All borough Permit Offices accept money orders, company checks, certified checks and most major credit cards for permit fees. Permeable Interlocking Concrete Paver (PICP). PERMITTEE MUST PROTECT DEP GREEN INFRASTRUCTURE DOWNSTREAM OF THE WORK OR WITHIN 5FT OF THE WORK AREA. The Street Works Manual is a tool intended to increase the performance of both city government and the private sector in this regard. Typical treatments include removing vault roof near curb, filling flowable lifts, and breaking vault floor. Canopy design and construction must be in accordance with NYC DOT Standard Details of Construction. The following section provides information on some issues that may delay the issuance of a permit or that may lead to the revocation of a permit. If the hold is not released, the applicant must contact DDC (DDC contact information is available in Appendix D, Other Agency and Utility Contact Information). Permit Bond. The applicant can also request a new vault license for an existing vault by submitting SCARA plans and make a one-time license fee of $2 per square foot. If guide sheets are to be included in a project, they should be included in a subset under that project. INTRES-RESTORE AS PER SKETCH #7 OF DOT'S PROTECTED STREET RESTORATION REQ'MENTS. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR FULL INTERSECTION RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Workers pour cement during sidewalk reconstruction. Customer Service: (212) 566-0042, Queens Tel: 311 or (718) 422-8700, Public Design Commission of the City of New York (PDC) Pedestrian RampsWhen a corner is constructed, reconstructed or repaired, pedestrian ramps must be installed in accordance with NYC DOT Standard Highway Specifications found and in accordance with the most recent revision of Drawing H-1011 from the NYC DOT's Standard Details of Construction. By accessing this map portal, a utility company or any other entity that performs street excavation work can find details on NYC DOT projects included in the city's 10-year Capital Budget, as well as more imminent NYC DOT and New York City Department of Environmental Protection capital projects currently in design or under construction. In this case, upon request of the permittee, NYC DOT will provide an opportunity to object to the permit revocation within five days after the request is received by NYC DOT. WORK 9 AM TO 7 PM EXCEPT SUNDAY. IF MULTIPLE LANES ON GOWANUS IN SAME DIRECTION AS MILLING, NO MILLINGY WORK MAY OCCUR. - see, UTILITY COVER EMBARGO 0700-1000 1600-2000 WEEKDAYS, UTILITY COVER EMBARGO 0700-1000 1600-1900 WEEKDAYS, UTILITY COVER EMBARGO/HOLIDAY EMBARGO 0600-2400 WEEKDAYS/WEEKENDS. Who has been found liable by a court or in a proceeding before the ECB of a violation of a rule or order of NYC DOT or the terms or conditions of a permit issued by NYC DOT or other applicable law, which violation caused an imminent peril to life or property. FULL WIDTH OF SIDEWALK SHALL BE OPENED TO PEDESTRIANS WHEN SITE IS UNATTENDED EXCEPT FOR CONCRETE CURING WHEN THAT PORTION OF THE SIDEWALK MAY REMAIN CLOSED PROVIDED ALL OTHER STIPULATIONS ON THIS PERMIT ARE COMPLIED WITH. Where certification is unobtainable from the manufacturer, certification by the installer may be submitted instead. Staten Island NY 10301 THIS EXECPTION DOES NOT APPLY IF STIPULATION 014 IS ALSO APPLIED TO THIS PERMIT. Regular Input and Attendance of Decision Makers at Coordination Prior to any permit revocation, NYC DOT will give the permittee an opportunity to be heard with not less than two days' notice. POST "NO STANDING 7AM- 6PM M-F" SIGNS ON THE NORTH CURB. OCMC will release the hold after it reviews the proposed work and adds the permit stipulations. For hearings, Monday to Friday from 8:30 AM to 3:30 PM. The Street Design Manual is New York Citys comprehensive resource for street design standards, guidelines, and policies. Brooklyn, NY 11211 It provides both a thorough update to the guidance in previous iterations and a number of important additions: a new chapter on public programming in streets and public spaces; a host of new entries throughout the Process, Geometry, Furniture, and Landscape chapters; and substantially expanded coverage of several key topics, including bike lanes, inclusive design, and landscape selection and management. Long Island City, NY 11101 MAINTAIN ONE 12 FOOT LANE FOR LOCAL AND EMERGENCY ACCESS AT ALL TIMES, PLACE BARRICADES AND POST SIGNS MEETING "FEDERAL MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)" STANDARDS STATING "ROAD CLOSED TO THROUGH TRAFFIC", MAINTAIN 2 LANES FOR TRAFFIC, 1 LANE IN EACH DIRECTION, MAINTAIN 4 LANES FOR TRAFFIC, 2 LANES IN EACH DIRECTION. Office hours: 8:30 AM-3:30 PM. OF BRIDGES: UPON INITIAL INSTALLATION OF A CANOPY, THE PERMIT TO MAINTAIN A CANOPY SHALL BE PLACED ON HOLD UNTIL A FINAL INSPECTION DETERMINES CANOPY WAS INSTALLED AS PER SUBMITTED PLANS. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE SOUTHEAST QUADRANT OF THE INTERSECTION. The central Permit Office entrance is via Vietnam Memorial Plaza between Water and South Streets. 22 Reade Street General Guidelines | NYC Street Design Manual The contact information and hours of operation for all Permit Offices can be found in Appendix C, NYC DOT Contact Information. Permits reissued after three business days must be subject to the full permit fee. All applications for construction or repair of a transformer vault must be accompanied by an electric utility company layout, and must comply with the minimum clearance requirements for transformer vaults unless an approval or waiver is obtained from the appropriate agency or utility (more information is available in. If all information is satisfactory the applicant is approved and the system auto-generates an email which is sent to the applicant with the EAN. Department of Transportation The Poles and Luminaires chart identifies which combinations of poles and luminaires are permitted. THIS PERMIT ONLY ALLOWS FOR THE CLOSURE OF A ROADWAY OR SIDEWALK AS STIPULATED. WORK 10 AM - 7 PM, MONDAY THROUGH FRIDAY. 10 Richmond Terrace, Room 308 For design criteria, technical information, finishes, and color specification, refer to DOTs Bureau of Traffic Operations, Division of Street Lighting specifications. 120-55 Queens Boulevard, 1st floor, Room 1-240 By eliminating manual steps, most permit requests now may be approved and issued within 1-2 business days. Capital Project In-House (CPI) hold A CPI hold is automatically placed if the proposed permit location involves a street that will be resurfaced by a NYC DOT in-house resurfacing operation in the near future. Fax: (718) 815-8391. Check traffic advisories. There is no fine associated with a Sidewalk Violation. If the applicant makes any changes to these authorized representative(s), he or she must update the Permittee Registration Application. This information should be used to plan work before streets go into protected street status. (718) 391-1958 Additionally, High Density Polyethylene (HDPE) conduit, a more cost-effective material that is not susceptible to corrosion from residual salt water after storm surge events, is replacing galvanized steel for all signal locations and street light locations in flood-vulnerable areas. In addition to the application procedures for the four categories of permit types, there are some situations or street conditions that require special procedures.